Project: Braden Road Phase Three – John Hart Highway 97 to North of 218M

Widening, strengthen and double pass seal coat 14.1 km of road.

Some of the quantities are:

  • clearing and grubbing of 48 ha;
  • stripping 75,000 m3;
  • excavation and embankment 190,000 m3;
  • 75,000 m3 gravel, crushing and hauling;
  • drainage improvements with installation of 938 m of new culverts
  • turf reinforced ditches;
  • concrete catchbasins and asphalt spillways;
  • 400,000 m2 geotextiles;
  • 140,000 m2 seal coating;
  • fencing.