Widening, strengthen and double pass seal coat 14.1 km of road.
Some of the quantities are:
- clearing and grubbing of 48 ha;
- stripping 75,000 m3;
- excavation and embankment 190,000 m3;
- 75,000 m3 gravel, crushing and hauling;
- drainage improvements with installation of 938 m of new culverts
- turf reinforced ditches;
- concrete catchbasins and asphalt spillways;
- 400,000 m2 geotextiles;
- 140,000 m2 seal coating;
- fencing.